WPS, PQR & welder qualification — code-compliant from day one.

Before a single production weld is laid down, the procedure must be qualified and the welder must be tested. We review WPS / PQR documents, witness procedure qualification tests and oversee welder performance qualification (WPQ) to ASME IX, AWS D1.1 and EN ISO 9606.

Live WPS / PQR ! WPS / PQR REVIEW · ASME IX GCS · Oman
Scope of work

What we cover.

The complete range of equipment and procedures included in this service line.

WPS Review

Welding procedure specification check

PQR Witnessing

Procedure qualification record testing

Welder Qualification

WPQ test piece witnessing

Welding Procedure Approval

Code-compliant WPS sign-off

Welder Continuity Records

6-month continuity validation

Document Control

Welding records & traceability

Standards

Codes & standards we work to.

Every certificate references the applicable code so you can audit every test back to its source.

ASME IXAWS D1.1EN ISO 9606EN ISO 15614

Ready to safeguard your assets & people?

Get a tailored quote for calibration, NDT, third-party inspection, vessel QC, welding inspection or safety training across Oman.

Schedule a weld inspection