Shutdown & turnaround — surge inspection power.
Surge inspection and NDT manpower for plant turnarounds and shutdowns — planning, execution and data-book delivery to keep your TAR on schedule.
Keep the turnaround on schedule.
Turnarounds compress months of inspection into days. GCS supplies planned, competent inspection and NDT crews for shutdown campaigns, executes the worklist against the schedule, and delivers the data book so the plant restarts on time and compliant.
What we cover.
The complete range of activities included in this service line.
TAR Planning
Worklist, manpower and schedule input
Vessel / Tank Entry
Internal inspection on entry
NDT Campaigns
UT, MPI, DPI and advanced NDT
Lifting Support
Rigging and lifting-gear inspection
Repair Verification
Post-repair NDT and acceptance
Data Book
Consolidated TAR inspection records
Why operators choose GCS.
Independent
Third-party reporting recognised by EPC and O&G majors in Oman.
Accredited
LEEA Full Member, ISO 17020 and ISO 17025 accredited delivery.
Fast mobilisation
Typically within 2 working days across Muscat, Sohar and Duqm.
Traceable records
Photographic reports and certificates issued within 5 working days.
Where this service is deployed.
Shutdown & Turnaround Inspection Support supports asset integrity and statutory compliance across Oman’s heavy industry.
Frameworks we work to.
Every report references the applicable code so your QA, client and insurer can audit decisions back to source.
How the job runs.
A repeatable, auditable sequence from enquiry to certificate.
Document review
OEM data, prior reports and service history reviewed before mobilising.
On-site examination
Visual, functional and dimensional checks against the checklist, fully photographed.
NDT / testing
Surface or volumetric NDT and functional or load testing as the code requires.
Findings & sentencing
Defects classified A/B/C, photographed and sentenced against the governing standard.
Certificate & tag
Certificate of Conformity and colour-coded tag issued within 5 working days.
Tools of the trade.
Calibrated, traceable instruments operated by qualified technicians — every tool carries a current calibration certificate.
Questions our clients ask most often.
Can you provide surge manpower for a turnaround?
Yes. We scale inspection and NDT crews up for shutdown and turnaround campaigns, working to your TAR schedule and worklist, then demobilise — so you only carry the headcount when you need it.
Do you deliver the turnaround data book?
Yes. We compile all inspection, NDT and repair-verification records into a consolidated data book for the turnaround, supporting plant restart and future inspection planning.
How quickly can GCS mobilise shutdown and turnaround inspection support in Oman?
For routine work in Muscat, Sohar or Duqm, mobilisation is typically within 2 working days. Emergency and field jobs can be mobilised same-day, with reports issued within 5 working days.
Related Oil & Gas Services services from GCS.
Shutdown Inspection
Our multi-discipline shutdown inspection service line.
View pageOil & Gas Facility Inspection Services
Multi-discipline inspection of plant, lifting, pressure and structural assets at…
View pageRig Lifting Equipment Inspection
Drilling-rig cranes, hoisting and lifting equipment inspected to API 4G, API RP 8B, LOLER…
View pageWellsite Lifting Gear Certification
Field examination and certification of slings, shackles, hoists and lifting equipment at…
View pageOil & Gas Services
All Oil & Gas Services services from GCS Oman.
View pageAll Services
Browse every GCS service line.
View page